How Ontario connects and powers its next wave of data centres will be the focus of an industry gathering in Mississauga on November 10, bringing utilities, developers, policymakers and investors together to discuss the infrastructure behind AI growth.
Energy Infrastructure for Canada’s Data Centres 2026, organized by EDKraft, takes place at the Hilton Toronto Airport Hotel & Suites. According to the organizer’s latest update, more than 100 delegates have registered, with over 70 organizations participating and limited places remaining.
The programme will examine grid readiness, transmission expansion and large-load connections, alongside the role of renewables, nuclear power and energy storage. Discussions will also address how policy and regulation can keep pace with development, and what operators need to deliver projects at scale.
One session will explore an 80 MW connection supporting a $1 billion data centre investment. Representatives from GrandBridge Energy, BLG and Cushman & Wakefield are scheduled to discuss the project from utility, legal and real estate perspectives, covering approvals, connection agreements and responsibility for costs. The case study promises a practical look at the steps between securing a site and bringing substantial new capacity online.
More than 20 speakers are confirmed, including Ontario Minister Stephen Crawford, Beverly Nollert of the Independent Electricity System Operator, Igor Rusic of Niagara Peninsula Energy and Dorothy Moryc of Enova Power.
The operator and developer perspective will include Marc Mondesir of Equinix, Craig Tavares of BUZZ HPC and Christopher Chong of Skeena Data Centers. Other participating organizations include Digital Realty, Telehouse Canada, the Ontario Energy Board, the Canadian Renewable Energy Association and the Electricity Distributors Association.
Together, the sessions will examine a central question for the sector: how to turn data centre investment plans into operating facilities with the electricity supply, connections and community support they require.

